Barrier, steel and set out, checked before any of it becomes permanent.
One of our inspectors will call you back.
If it is urgent, email hello@buildinginspectionsedmondsonparksydney.com.au
Fully licensed & accredited
NSW Fair Trading
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society The slab carries the house, and its engineering lives in beam geometry, reinforcement, cover and a vapour barrier that is specified as continuous. On the Austral records behind this page the barrier was found with sections missing, which is the clearest example of a pre-pour item there is: seconds to tape, impossible to reach an hour later. Slab edges and rebates were recorded on the same run.

Annotated findings from Slab pre-pour inspections.




1Bored piersAfter boring and cage placement, before concrete
3FrameOnce frame and trusses are up and the roof is on, before lining
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before the painter
6WaterproofingAfter the membrane is applied and before any tile is laid
7Pre-handover (PCI)Two to three weeks before your handover dateInstant online pricing for Edmondson Park, or contact the booking team.
It stops ground moisture rising into the slab and the floor covering above it. Specified continuous, a missing section is a hole in the thing that was specified.
Only the surface. Cover, steel, beam sizes and barrier all stop being verifiable the instant concrete is placed.
We follow the new date, at no extra cost.
An hour to ninety minutes on a standard lot, with the report out that evening because the truck arrives in the morning.
Yes. Trimming required at a shower recess was recorded on the Austral run, and a set down that is wrong at pour is expensive to correct at tiling.
The engineering for your lot together with the soil report it was drawn from.