The list written while you still have leverage, two to three weeks before you sign.
One of our inspectors will call you back.
If it is urgent, email hello@buildinginspectionsedmondsonparksydney.com.au
Fully licensed & accredited
NSW Fair Trading
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society A handover inspection is measured against your contract and selections, the Guide to Standards and Tolerances 2017, the National Construction Code and ABCB Housing Provisions, AS 3700 for masonry, AS 3740 for wet areas and AS 3000 for the electrical clearances noted.
37 checkpoints across 10 areas on a standard Edmondson Park pre-handover (PCI) inspection. We need the property accessible and, on a new build, the site supervisor aware an independent inspector is attending. Whatever is blocked on the day gets recorded as inaccessible, never as checked.










New Construction Stage Inspections Seven checks through an Edmondson Park build, read against your engineering.
Apartment and Strata Inspections The lot and the visible common property, checked before you buy in Edmondson Park.
Building and Pest Inspections Both reports from one attendance, on a suburb with nothing older than 2012.
Defect Investigation Reports A single element, measured against the requirement behind it. Instant online pricing for Edmondson Park, or contact the booking team.
Because insulation packed against a fitting that needs an air gap is a fire risk. It is reported as a hazard rather than folded into the finish list, and it is corrected by an electrician or an insulation installer, not by us.
Yes, and the report gives the width rather than the adjective. Under five millimetres is usually within tolerance and is recorded so that a later reinspection can tell whether it moved.
Somewhere between two and three weeks ahead of your handover date. Later than that and the builder has no window to act, which turns a defect list into a settlement argument.