Edmondson Park Building
Inspections

The steel column that was not there

The plainest finding on any report.

Edmondson Park 2174 · 20 August 2026

Fully licensed & accredited

  • NSW Fair Trading NSW Fair Trading
  • Australian Society of Building Consultants Australian Society of Building Consultants
  • Strata Community Association Strata Community Association
  • Building Dispute Practitioners Society Building Dispute Practitioners Society

In short: A steel column recorded not installed, on a frame summarised as defective, in Austral.

What was recorded

Not installed, against steel columns and posts, at high severity on an Austral frame inspection. The same job's inspection summary reads: overall conditions, defective.

Why it is worth writing about

Because it is the finding people assume cannot happen. A steel column is on the drawing, it is expensive, and it is structural. It was still absent when we attended.

How it happens

A member on back order, a sequence changed on site, and nobody circling back. It is almost always an omission rather than a decision.

The summary matters too

A frame described in the report as defective sets the tone for everything after it. It is also the sort of language a tribunal reads carefully, which is why it is used sparingly and only when the evidence supports it.

What follows

The item goes to the builder with the drawing reference. On something this size the answer is usually immediate.

Written by our local inspection team from work carried out in Edmondson Park. Licensed building practitioners.

Guides

More defect reports guides for Edmondson Park

All guides →

Book a building inspection in Edmondson Park

Instant online pricing for Edmondson Park, or contact the booking team.

FAQ

Questions Edmondson Park owners ask about this

Would the build have continued?

Very likely, because the next trade works to a program rather than to a drawing. That is the argument for attending at the end of frame rather than after it.

Is a summary of defective unusual?

In our reports, yes. Most frames are recorded as acceptable or mid level, and two of the Austral summaries say exactly that.

Does it mean the builder is bad?

It means one job had a serious omission. What matters next is how quickly it is corrected.

Where was this?

Austral, six kilometres north west of Edmondson Park.